Light in glass covers about 102 km of great-circle distance per millisecond of round trip, so the working rule is 1 ms of RTT per 100 km. That figure follows from the group index of common long-haul fibre, 1.4682 at 1550 nm for Corning SMF-28 Ultra, and it is the part of the number nobody can engineer away. What varies is the length of the path. Submarine cables follow the seabed and land where the landing licences are: the Pacific Caribbean Cable System lands in Panama at Balboa and María Chiquita and runs north to Jacksonville, not Miami. Terrestrial backhaul from the landing station to a data centre adds its own kilometres, and every router on the way adds a little queuing.
Routing is the larger variable, and in Latin America it is often the dominant one. Bogotá is 766 km from Panama City, a 7.5 ms floor. If a Colombian access network and our upstream only exchange traffic in Miami, the packet travels Panama → Miami → Bogotá, roughly 4,300 km, and the floor rises to 42 ms before any router has queued it. San José, Costa Rica is worse in proportion: 5 ms direct, 36 ms through Florida. This hairpin is common because Miami is where most of the region's carriers meet. Panama does have its own exchange, InteRed Panamá, which PeeringDB listed with 26 networks on 3 November 2026, with ports at Ufinet's Obarrio site and at Panama Digital Gateway; traffic exchanged there stays in the country.
Panama's physical position works in its favour on the other side. It touches two oceans, La Estrella de Panamá counted nine submarine cables in Panamanian waters in July 2026, and some land on the Pacific coast: Google's Curie, which links California with Chile, has a branch to Balboa. A route south along the Pacific, or north to the US West Coast, therefore does not have to pass through Florida. Whether it actually does depends on the carrier holding the route, and only a measurement from your users' networks shows which way it goes.